The first two of Kuhner’s next generation SB2500-Z orbital shaken bioreactors will be delivered to one of our customers in September.
The first two of Kuhner’s next generation SB2500-Z orbital shaken bioreactors will be delivered to one of our customers in September. Last week, we successfully performed the Factory Acceptance Test (FAT). Now, the bioreactors will be dissembled and packaged for their transport to the production facility. Apon arrival, the SB2500-Z will be unpackaged, reassembled and prepared for the Site Acceptance Test (SAT) and the Installation and Operation Qualification (IQ/OQ). All tests and qualifications are supposed to be finished by Mid-November.